NC Department of Transportation Quick Links
Rail Division
triskelion
Home Emergency Numbers Feedback and FAQ Kids Pages Staff Directory News
Passenger Trains
High Speed Rail
Future Service
Station Improvements
Safety Programs
Track Improvements
Industrial Access
Corridor Preservation
Quick Links

American Recovery &
Reinvestment Act


2009 North Carolina ARRA
Applications for Track 1 and Track 2
ARRA News Release-Feb.16, 2010>
List of Projects by Track>
List of Projects by County>
ARRA News Release-Jan. 28, 2010>

Federal

Federal Railroad Administration
FRA Accident Report Investigations

Federal Transit Administration

Federal Highway Administration

National Archives and Records Administration

National Transportation Safety Board

U.S. Department of Transportation

Other States

Florida High Speed Rail Authority

Georgia Department of Transportation

South Carolina Department of Transportation

Virginia Department of Rail and Public Transportation

Railroads

Amtrak

CSX Transportation

Norfolk Southern Corporation

North Carolina Railroad

Institute for Transportation Research & Education (ITRE)

N.C. Operation Lifesaver

Transportation Research Board

Associations

American Association of State Highway & Transportation Officials (AASHTO)

American Public Transportation Association (APTA)

American Railway Engineering and Maintenance-of-Way Association (AREMA)

American Shortline and Regional Railroad Association

Association of American Railroads

Association of Metropolitan Planning Organizations (A-MPO)

Brotherhood of Locomotive Engineers

Carolinas Association for Passenger Trains

National Association of Railroad
Passengers

National Corridors Initiative

N.C. American Planning Association

N.C. League of Municipalities

N.C. Public Transportation Association

Railway Association of North Carolina

Reconnecting America, Inc.

States for Passenger Rail Coalition

United Transportation Union

North Carolina Rail Map
(435K PDF)

Updated February 2013

The Future is Arriving
By Walter R. Turner, Historian, NC Transportation Museum


Train Schedules
Trains 73, 76, 79, 80 and NC Amtrak Connector Shuttle Service
(PDF Files)


Consultants
Consultant qualification process


Reports/Documents

NCDOT Quarterly Report #54
January 2011

NCDOT Quarterly Report #53
October 2010

NCDOT Quarterly Report #52
August 2010

NCDOT Quarterly Report #51
May 2010

A Final Report: Railview
September 2010

CRISP 4th Ward Presentation
September 2010

CRISP 3rd Ward Presentation
November 2010

Refurbishment & Rebuild
Program Presentation
January 6, 2010

2009 Rail Plan
Executive Summary
March 2009

Highway/Rail Crossing Inventory Instruction Manual
February 2009

Cost to Reactivate Piedmont & Northern Rail Line
Report to the Joint Legislative Transportation Oversight Committee
January 15, 2009

Charlotte Multi Modal Station and Mainline Separation Project
December 31, 2008

Fayetteville Train Operations Study
November 2008

Evaluation of High-Speed Rail Options in the Macon-Atlanta-Greenville-Charlotte Rail Corridor
Introduction>
Executive Summary>
Report>

 

New Vision for Intercity Rail Unveiled
December 2007
News Release>
Executive Summary>
Full Report>

Railroad Crossing Wayside Horn Evaluation: Final Report
May 2007

North Carolina Waybill Analysis Executive Summary
November 2006

Southeastern North Carolina Passenger Rail Study
July 2005

EVA Signal System Report
April 2005

North Carolina DOT Traffic Separation Studies Volume I - Assessments
September 2004

North Carolina DOT Traffic Separation Studies Volume II - Findings by Community
September 2004

Southeastern North Carolina Passenger Rail Feasibility Study: Track and SIgnal Improvements, August 2004
Report (9MB PDF)
Appendix -Scenario 1
Appendix-Scenario 2
Appendix-Scenario 3)

Soil Nail Wall Project
July 2004

Economic Feasability Study for the Restoration of the Wallace to Castle Hayne Rail Corridor and Assciated Port/Rail Improvements
February 2004
Report
Appendix

Private Crossing Safety Initiative October 2003
Full Report
Appendix

Economic and Fiscal Impact Analysis of Station Revitalization
December 2003

Charlotte Multi-Modal Station Feasibility Study-Executive Summary
July 2002

Sealed Corridor Assessment Report-Executive Summary
May 2002

Western North Carolina Rail Operations & Station Right-of-Way Acquisition
April 2002

Winston-Salem Union Station
Feasibility Study

February 2002

Sealed Corridor USDOT Assessment Report
September 2001

Southeastern NC Passenger Rail Feasibility Study
May 2001

Western NC Passenger Rail Study
March 2001 (462K PDF)

Exit Gate Arm
May 2000 (461K PDF)

Crossing Law Engorcement and Research of (CLEAR) Violations
June 1999 (400K PDF)