NC Department of Transportation Safety Programs
Rail Division
triskelion
Home Emergency Numbers Feedback & FAQ Kids Pages Staff Directory News
Safety Programs
Crossing Signals
Closing Crossings
Traffic Separation Studies
Sealed Corridor Program
Inspections
New Technology

Passenger Trains
High Speed Rail
Future Service
Station Improvements
Track Improvements
Industrial Access
Corridor Preservation
Quick Links

New Technology

June 30, 2001

I.D. Number: P-3812
County: Northampton

Subject: Bi-annual Report # 1
North Carolina Innovative Traffic Control Field Experiment of the EVA Signal System;
FHWA Project: Request VIII-53 (Expr.) North Carolina EVA RR-Xing Signal System"

Mrs. Louisa Ward
Federal Highway Administration
Office of Railroad Development
400 Seventh Street, SW
HOTO-1, Room 3408
Washington, DC 20590

Dear Mrs. Ward:

The North Carolina Department of Transportation has completed the following tasks as part of the EVA Signal System Experiment:
  • The EVA Signal equipment has been shipped to the railroad’s depot.
  • The project has been delayed waiting for the Power Company to supply power to the site. The Power Company will have a power drop installed at the site by July 20.
  • NCSU has developed the driver and train crew surveys to be used for the driver behavior survey.
  • The NCDOT has approved the surveillance equipment to be used at the site. The equipment will record 24 hours of crossing activation. We intend to record the crossing when the train reaches the approach until the engine and several cars have crossed through the crossing.
  • Installaiton of the below ground EVA Signal equipment should occur in early August to be followed by the complete installation in September.
  • The NCDOT has installed drainage pipes, placed necessary fill and trimmed/cut trees as needed.

Please contact me at (919) 733-5587 if you have any questions.

Yours very truly,
Jason L. Field, P.E.
Crossing Project Engineer