Alternative 1
Downtown Gateway
Proposed Alternative 1 creates a new connection between Front Street and Main Street by constructing a new roadway just east of Church Street. This new roadway will feature a roundabout at the intersection with Main Street, and pedestrian sidewalks connecting the community and downtown.

Alternative 2
Lombard Street Relocation
Proposed Alternative 2 relocates Lombard Street to create a new connection with Front Street just east of Church Street. The relocated Lombard Street will begin near Main Street and travel west along the alley on the north side of Main Street. The roadway will then tie into the new underpass just east of Church Street. A new pedestrian walkway will provide access from Lombard Street to Church Street.

Alternative 3
Lombard Street Extension
Proposed Alternative 3 extends Lombard Street from Main Street to Front Street via a new pedestrian/vehicle underpass. New pedestrian sidewalks will be installed, providing a connection between the community and downtown.

Alternative 4
Church Street
Proposed Alternative 4 places the pedestrian/vehicle underpass on Church Street, just south of Front Street. New pedestrian sidewalks will be installed, providing a connection between the community and downtown.

Alternative 5
Smith Street
Proposed Alternative 5 places the pedestrian/vehicle underpass east of the former Smith Street, just south of Front Street. New pedestrian sidewalks will be installed, providing a connection between the community and downtown.

Alternative 6
Crossing Remains the Same - No BUILD
Proposed Alternative 6, the No Build alternative, would result in the existing roadways remaining as they are currently, with no new grade separation being built.
No action is taken and the crossing remains as it is today. As a result, crossings will continue to be blocked while trains pass, restricting vehicular access, including emergency vehicles. Church Street remains as it is today.